Image

CATAWBA COUNTY PERMIT DETAIL REPORT

PLUMBING (C)
Alteration
Architect
HMK ARCHITECTS PLLC, 5300 MARYLAND WAY, BRENTWOOD TN 37027
Contact Person
LOOPER & COMPANY, DAVID E, , 
Lien Agent
CHICAGO TITLE COMPANY, LLC, 19 W HARGETT ST, RALEIGH NC 27601
Owner
HEALTH CARE PROPERTY INVESTMENT, 3760 KILROY AIRPORT WAY 300, LONG BEACH CA 90806
Site Construction Contact
DALE LOWE, , 
Contractor
Contractor

CONTACT LIST

GENERAL INFORMATION

LIEN AGENT ENTRY NUMBER:

PROPERTY ID#:

STREET ADDRESS:

1 3RD AVE NW, HICKORY NC 28601

GIS

928315

PROJECT:

PROJECT DESCRIPTION:

Install New Toilets, Sinks & Showers - 33 New Fixtures/ Renovations of existing 84 bed behavioral health unit at Frye Hospital.

APPLIED:

EXPIRES:

ISSUED:

10/18/2018
10/18/2018
01/17/2022

STATUS:

Final

TOTAL SQ FT

TYPE OF USE:

WORK CLASS:

Institutional
 0
Alteration

RELATED_PERMIT#

WORK CLASS

STATUS

ISSUED

FINALED

BLDC-10-2018-106839
Alteration
Final
10/16/2018
01/29/2021

RELATED PERMITS

PLAN CASE

STATUS

COMPLETED

WORK CLASS

DISTURBED ACRES

Approved
10/12/2018
Building Alteration
N/A

RELATED PLAN CASES

ACTIVITIES

INSPECTION HISTORY

SCHEDULED

COMPLETED

STATUS

INSPECTION TYPE

Plumbing Final
Jimmy Martin
01/29/2021
Approved
(828)639-0709
01/29/2021
Other Inspector Comments
Final this case
Plumbing Final
Jimmy Martin
11/05/2020
Follow Up Required
(828)639-0709
11/05/2020
Other Inspector Comments

Final for 2nd Floor North Hallway 860 and 870 approved

First floor not completed at this inspection

Image

CATAWBA COUNTY PERMIT DETAIL REPORT

Plumbing Final
Jimmy Martin
11/03/2020
Failed
(828)639-0709
11/03/2020
Other Inspector Comments
1. Complete installation of flush valve covers
Plumbing Above Ceiling
Jimmy Martin
10/19/2020
Approved with notes
(828)639-0709
10/19/2020
Other Inspector Comments

Plumbing rough inspection

Shower valves replaced 

Tempering valve in wall connected to both hot and cold water on faucet.

Plumbing Final
Craig Taylor
07/02/2020
Follow Up Required
(828)639-0396
07/02/2020
Other Inspector Comments
Approval of third floor only, project has more phases to be completed
Plumbing Rough
Lamar Coffey
05/05/2020
Approved
(828)217-1105
05/05/2020
Other Inspector Comments
1. Third floor only.
Plumbing Final
Craig Taylor
02/13/2020
Approved
(828)639-0396
02/13/2020
Other Inspector Comments
Final this case
Plumbing Final
Lamar Coffey
02/13/2020
Approved
(828)217-1105
02/13/2020
Other Inspector Comments

Final this case.

 

NOTE 1...2nd floor West.

NOTE 2...This Inspection was assisted by Inspector Craig Taylor for credit toward Level 3 Plumbing certification.

Shower Pan
Lamar Coffey
11/22/2019
Approved
(828)217-1105
11/22/2019
Other Inspector Comments
1. Second floor---Pre-Fab. pan
Plumbing Final
Lamar Coffey
09/25/2019
Approved
(828)217-1105
09/25/2019
Other Inspector Comments

Final this case.

Basement/lower level only.

Plumbing Final
07/17/2019
In Progress
Other Inspector Comments

1. This Inspection approves the plumbing on the 1st floor west only---permit to remain open for futher areas of construction.

Plumbing Rough
Lamar Coffey
05/23/2019
Approved
(828)217-1105
05/23/2019
Other Inspector Comments
1. Shower valves basement level.
Plumbing Rough
05/15/2019
In Progress
Other Inspector Comments
1. This Inspection was for rooms 783....and....726B only at this time.
Plumbing Under Slab
04/25/2019
In Progress
Other Inspector Comments
1. Shower drains for the 1st. floor ---West side.
E9 - rpermitdetail
Page 2 of 2
10/18/2025  11:45