**Temp Elect agreement Doc on file--install elect system for shell building & SITE WIRING for site parking lot for Walmart & Shop 1 building *** shell building / utility stub for future tenants, slab leave-out
APPLIED:
EXPIRES:
ISSUED:
|
|
|
STATUS:
|
TOTAL SQ FT
TYPE OF USE:
WORK CLASS:
|
|
|
RELATED_PERMIT#
WORK CLASS
STATUS
ISSUED
FINALED
|
|
|
|
|
RELATED PERMITS
PLAN CASE
STATUS
COMPLETED
WORK CLASS
DISTURBED ACRES
|
|
|
|
RELATED PLAN CASES
ACTIVITIES
INSPECTION HISTORY
SCHEDULED
COMPLETED
STATUS
INSPECTION TYPE
|
|
|
|
|
|
|
Final this case.
This inspection was for the Parking Lot Pole Lights
|
|
|
|
|
|
CATAWBA COUNTY PERMIT DETAIL REPORT
|
This inspection is for the main disconnect and sub-panel HP1 and transformer and LC1.
THIS IS FOR PARKING LOT LGHTS ONLY
OK TO ENERGIZE PANELS ABOVE
DO NOT ENERGIZE ANY OTHER CIRCUITS
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
This inspection was for the 6 inch raceways underground for passage of Dukes service lines into the Walmart structure. This inspection was conducted on Saturday, 5/2/15. This was an afterhour inspection. Time began at 10:30 AM and concluded at 12:30 PM, a total of 2 hours.
|
|
|
|
|
|
|
This inspection approves three (3) Pole light Base Footings as highlighted on the plans in Pinl---DLC, 5/1/15
CATAWBA COUNTY PERMIT DETAIL REPORT
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|