Image

CATAWBA COUNTY PERMIT DETAIL REPORT

ELECTRICAL (C)
Alteration
Architect
HMK ARCHITECTS PLLC, 5300 MARYLAND WAY, BRENTWOOD TN 37027
Contact Person

*VANNOY CONSTRUCTION/ SEE OTHER LISTING, 1255 CREEKSHIRE WAY SUITE 220, WINTSON-SALEM NC 27103

Land Owner
HEALTH CARE PROPERTY INVESTMENT, 3760 KILROY AIRPORT WAY 300, LONG BEACH CA 90806
Lien Agent
CHICAGO TITLE COMPANY, LLC, 19 W HARGETT ST, RALEIGH NC 27601
Owner
FRYE REGIONAL MEDICAL CENTER INC, PO BOX 92129, SOUTHLAKE TX 79092
Contractor
Contractor

CONTACT LIST

GENERAL INFORMATION

LIEN AGENT ENTRY NUMBER:

PROPERTY ID#:

STREET ADDRESS:

420 N CENTER ST, HICKORY NC 28601

GIS

608918

PROJECT:

PROJECT DESCRIPTION:

Interior wiring, 5 change out panels (2-100amps, 2- 200 amps, 1 250 amps)--The work will be completed in three primary phases Phase 1:the laboratory department will be constructed in the 4th floor shell space 6,273 SF and relocated from its 1st floor location Phase 2: the existing vacated lab space (6,499 SF) will be renovated to expand the existing emergency department, Phase (3) renovations and upgrades to finishes in the existing emergency department (12,075 SF)

APPLIED:

EXPIRES:

ISSUED:

03/29/2017
03/29/2017
10/22/2019

STATUS:

Final

TOTAL SQ FT

TYPE OF USE:

WORK CLASS:

Institutional
 0
Alteration

RELATED_PERMIT#

WORK CLASS

STATUS

ISSUED

FINALED

BLDC-03-2017-083144
Alteration
Final
03/20/2017
11/05/2018

RELATED PERMITS

PLAN CASE

STATUS

COMPLETED

WORK CLASS

DISTURBED ACRES

Approved with notes
01/29/2018
Building Alteration
N/A

RELATED PLAN CASES

ACTIVITIES

INSPECTION HISTORY

SCHEDULED

COMPLETED

STATUS

INSPECTION TYPE

Electrical Final
Brad Honeycutt
11/05/2018
Approved
(828)639-1025
11/05/2018
Other Inspector Comments
FINAL THIS CASE
Image

CATAWBA COUNTY PERMIT DETAIL REPORT

Electrical Above Ceiling
Lamar Coffey
10/26/2018
Approved
(828)217-1105
10/26/2018
Electrical Rough
Brad Honeycutt
10/17/2018
Follow Up Required
(828)639-1025
10/17/2018
Other Inspector Comments
SOFFIT AT RECEPTION APPROVED.
Electrical Rough
Brad Honeycutt
10/12/2018
Approved with notes
(828)639-1025
10/12/2018
Other Inspector Comments
ED LOBBY APPROVED.
Electrical Final
Brad Honeycutt
08/16/2018
Approved
(828)639-1025
08/16/2018
Other Inspector Comments
FINAL THIS CASE. SECOND HALF OF NEW ER.
Electrical Above Ceiling
Brad Honeycutt
08/02/2018
Approved with notes
(828)639-1025
08/02/2018
Other Inspector Comments

PHASE 3B APPROVED WITH EXCEPTION OF 141,139,140 and partial corridor 147.

Electrical Rough
Brad Honeycutt
06/26/2018
Approved with notes
(828)639-1025
06/26/2018
Other Inspector Comments
PHASE III B APPROVED.
Electrical Final
Brad Honeycutt
05/16/2018
Approved with notes
(828)639-1025
05/16/2018
Other Inspector Comments
Phase 3A APPROVED.
Electrical Above Ceiling
Brad Honeycutt
04/30/2018
Approved with notes
(828)639-1025
04/30/2018
Other Inspector Comments
PHASE 3 AREA A APPROVED.
Electrical Rough
Brad Honeycutt
04/11/2018
Approved
(828)639-1025
04/11/2018
Other Inspector Comments

.FOLLOWING ROOMS APPROVED ; 1008,1009,148,149,150,151,173,154,155,169,153,152,171,170,170a,170b,170c,corridor for this area.

Electrical Above Ceiling
Brad Honeycutt
03/01/2018
Approved
(828)639-1025
03/01/2018
Other Inspector Comments

FOLLOWING ROOMS APPROVED:

180,181,182,183,196.

Electrical Final
Brad Honeycutt
03/01/2018
Failed
(828)639-1025
03/01/2018
Other Inspector Comments
PHASE 2 APPROVED.
Electrical Above Ceiling
Brad Honeycutt
02/09/2018
Approved
(828)639-1025
02/09/2018
Other Inspector Comments

FOLLOWING ROOMS APPROVED:

100,100-A,136,137,138,cor 142,134,133,130,126,124,125,108,109,118,1013,1013-A,1014,cor 1014.

Electrical Above Ceiling
Brad Honeycutt
02/02/2018
Approved with notes
(828)639-1025
02/02/2018
Image

CATAWBA COUNTY PERMIT DETAIL REPORT

Other Inspector Comments

.FOLLOWING ROOMS APPROVED :

101,101-A,101-B,102,102-A,103,104,105,106,107,110,113,114,117,115,116,Corridor 131,111,112,Partial corridor 120 and 142.

Electrical Rough
Brad Honeycutt
02/02/2018
Approved with notes
(828)639-1025
02/02/2018
Other Inspector Comments
.ROOM 138 APPROVED.
Electrical Rough
Brad Honeycutt
01/23/2018
Approved
(828)639-1025
01/23/2018
Other Inspector Comments
ROOMS 1013,1013A AND 196 APPROVED.
Meeting w/ Elec Contractor
Brad Honeycutt
01/11/2018
Approved
(828)639-1025
01/11/2018
Other Inspector Comments
DISCUSSED REVISED DRAWINGS.
Electrical Rough
Brad Honeycutt
01/03/2018
Approved
(828)639-1025
01/03/2018
Other Inspector Comments
ROOMS 136 & 137 APPROVED.
Electrical Rough
01/02/2018
Not Ready
01/02/2018
Electrical Rough
Brad Honeycutt
12/20/2017
Approved with notes
(828)639-1025
12/20/2017
Other Inspector Comments

.rooms,107,104,103,101,134,133,130,126,125,124,118,115,116,117,122.

.partial cor 142.

Office 1014.

.cor 111.

.cor outside rooms 134-124.

.soffit 132 and 123.

Electrical Rough
Brad Honeycutt
11/29/2017
Approved with notes
(828)639-1025
11/29/2017
Other Inspector Comments

.ROOMS 110,106,105,102,100,129,127,128,113,114.

.SIDE WALLS ONLY IN ROOMS 101,103,107(need to inspect head walls when ready).

.CLOSETS 108,109.

Electrical Rough
Lamar Coffey
11/10/2017
Approved
(828)217-1105
11/10/2017
Other Inspector Comments
This Inspection was for the OFFICE/LOCKER areas only.
Electric Under Slab
Brad Honeycutt
10/10/2017
Approved
(828)639-1025
10/10/2017
Other Inspector Comments
NURSES STATION 142 APPROVED.
Electrical Final
Brad Honeycutt
09/01/2017
Approved with notes
(828)639-1025
09/01/2017
Other Inspector Comments

FIRST FLOOR PHASE ONE,MORQUE,ULTRASOUND 001,002 AND 003 APPROVED. DO NOT FINAL. MORE WORK ON THIS PERMIT.

Electrical Above Ceiling
Brad Honeycutt
08/23/2017
Approved with notes
(828)639-1025
08/23/2017
Other Inspector Comments
MORGUE,ULTRASOUND ROOMS 001,002 AND 003 APPROVED.
Image

CATAWBA COUNTY PERMIT DETAIL REPORT

Electrical Final
Brad Honeycutt
07/25/2017
Approved
(828)639-1025
07/25/2017
Electrical Above Ceiling
Brad Honeycutt
07/14/2017
Approved
(828)639-1025
07/14/2017
Electrical Rough
Brad Honeycutt
07/10/2017
Approved with notes
(828)639-1025
07/10/2017
Other Inspector Comments

2 data boxes roughed in to knee wall on 4th floor.

Morgue back wall rough in

CKL 4C3 new panel ok for power

Electrical Rough
Brad Honeycutt
06/30/2017
Approved with notes
(828)639-1025
06/30/2017
Other Inspector Comments

1-CARD READER IN HALL.

2-RELOCATED RECEPTACLE IN GROSSING.

3-RELOCATED POWER AND DATA IN HISTOLOGY.

4-ADDED POWER FOR EQUIPMENT IN HISTOLOGY.

Electrical Rough
Brad Honeycutt
06/26/2017
Approved with notes
(828)639-1025
06/26/2017
Other Inspector Comments

FIRST FLOOR:

1-ULTRA SOUND.

2-MORGUE.

Electrical Rough
Lamar Coffey
06/19/2017
Approved with notes
(828)217-1105
06/19/2017
Other Inspector Comments

1. This Inspection was for additions of electrical added to the previously inspected Knee Walls.

2. This Inspection was for the Card Readers each side of corridor.

 

NOTE: These Inspections were for the 4th. Flloor LAB.

Electrical Rough
Brad Honeycutt
05/31/2017
Approved with notes
(828)639-1025
05/31/2017
Other Inspector Comments

BALANCE OF 4th FLOOR LAB WITH EXCEPTION OF FOLLOWING:

 

CONFERENCE ROOM DOOR AND ANTE ROOM SWITCHES.

Electrical Rough
Brad Honeycutt
05/19/2017
Approved with notes
(828)639-1025
05/19/2017
Other Inspector Comments

4TH FLOOR LAB APPROVED EXCEPT THE FOLLOWING:

.LOW WALLS IN RECEPTION AREA.

.AROUND DOORS ENTERING HALL.

.6" WALL IN TOILET 413.

.WALL BETWEEN GROSSING AND HISTOLOGY.