CATAWBA COUNTY PERMIT DETAIL REPORT
|
|
|
|
|
|
|
|
|
|
CONTACT LIST
GENERAL INFORMATION
PROPERTY ID#:
STREET ADDRESS:
|
PROJECT:
PROJECT DESCRIPTION:
Solar panel farm A (Original acres 58.62 - added an additional 48 acres to permit for total of 107) * 10-19-11 - added an additional 64.37 acres for total acres of 107.99 acres)
Correction: total acreage is 170.99
ACN 10/24/11 ** adding an additional 10 acres to permit 170.99 +10.00 = 180.99 total acres as of 2/8/12
APPLIED:
EXPIRES:
ISSUED:
|
|
|
STATUS:
|
PLAN CASE
STATUS
COMPLETED
WORK CLASS
DISTURBED ACRES
|
|
|
RELATED PLAN CASES
ACTIVITIES
DATE
ACTIVTY
COMMENTS
|
|
met w/engineer & contractors to discuss plantings along draw. Area will be stabilized and plan amended asap.
|
|
preconstruction meeting w/contractor and subs, Town of Maiden, McGill, me.
INSPECTION HISTORY
SCHEDULED
COMPLETED
STATUS
INSPECTION TYPE
|
|
|
|
CATAWBA COUNTY PERMIT DETAIL REPORT
|
Check dams that are installed in some of the ditches should be maintained. Sediment is accumulating and should be removed for check dams to function properly. All sediment basins should have sediment removed where accumulation has occurred and diminshed storage capacity. Several of the basins have sediment accumulations that are halfway up the baffles. Remove and properly dispose of all sediment and reinstall baffles where necessary.
Inlet protection should be maintained. Sediment is accumilating around most inlets with capacity and effectiveness being diminished. Remove and properly dispose of all sediment around inlets and reinstall stone where necessary.
|
|
|
|
|
|
|
|
|
site ground cover established. Give conditional close, check to ensure ground cover is complete in 3 to 6 months.
|
|
|
Site is being prepared for final grading of internal roadways and the final c2" ABC Stone placement on roadways. Final grading of roadside swales currently occuring. Retaining is being rebuilt and should be complete within two weeks. After road grading is complete, final seed and straw will be placed and site can be released after permanent groundcover is established.
Corrective measures should be taken to remove sediment from several inlet protection areas and check dams where sediment has accumulated. Additional grading and erosion control measures should be implemented in areas where the last rainfall event has caused damage.
|
|
|
|
|
Toni and I met Brandon Stough and rode the site. Site is still in the process of being prepared for final grading of internal roadways and the final c2" ABC Stone placement on roadways. They have completed some of the roadways. They started in the rear of the property and are working their way out towards the front. Final grading of roadway swales currently occuring. Retaining wall is complete. After road grading is complete, final seed and straw will be placed and site can be released after permanent ground cover is established.
|
|
|
|
|