Image

CATAWBA COUNTY PERMIT DETAIL REPORT

EROSION CONTROL (C)
Addition
Applicant
CATAWBA VALLEY MILLS ADDITION, ,   
Contact Person
PHILLIP BUNTON, PO BOX 1058, HICKORY NC 28603-1058
Financier
*CAROLINA CONSTRUCTION COMPANY, 3890 SPRINGS RD, HICKORY NC 28601-
Owner
ASHFAR ENTERPRISES INC, 450 7TH AV 2801, NEW YORK NY 10123
Primary Contractor

CONTACT LIST

GENERAL INFORMATION

PROPERTY ID#:

STREET ADDRESS:

3772 PLATEAU RD, NEWTON NC 28658

GIS

PROJECT:

PROJECT DESCRIPTION:

ADDITION

DIRECTIONS:

FROM NEWTON/ HWY 10 TO 127/ RT ON PLATEAU RD/ 3 MILES ON LT

APPLIED:

EXPIRES:

ISSUED:

05/28/2010
05/28/2010
09/29/2014

STATUS:

Closed

PLAN CASE

STATUS

COMPLETED

WORK CLASS

DISTURBED ACRES

Approved with notes
05/27/2010
Grading Plan

RELATED PLAN CASES

ACTIVITIES

INSPECTION HISTORY

SCHEDULED

COMPLETED

STATUS

INSPECTION TYPE

Erosion Control Site Inspection
Kim Sue
09/30/2011
Approved
10/19/2011
Erosion Control Inspection Notes

I spoke with Phil Bunton and Toni signed off on the blue erosion control sheet.  Closing case.

Erosion Control Site Inspection
Kim Sue
08/31/2011
Approved
08/23/2011
Erosion Control Inspection Notes
no erosion issues
Erosion Control Site Inspection
Kim Sue
07/29/2011
Approved
07/19/2011
Erosion Control Inspection Notes
Parking lot paved. No erosion issues
Erosion Control Site Inspection
Kim Sue
06/30/2011
Approved
06/17/2011
Erosion Control Inspection Notes
no erosion issues
Erosion Control Site Inspection
05/31/2011
In Progress
05/18/2011
Erosion Control Inspection Notes

I spoke with Larry and they are going to reseed beside the building the bare spots and also where the power company trenched in their line.

Erosion Control Site Inspection
Kim Sue
04/05/2011
Approved
04/05/2011
Erosion Control Inspection Notes
all disturbed areas have been hydroseeded.
Image

CATAWBA COUNTY PERMIT DETAIL REPORT

Erosion Control Site Inspection
Kim Sue
03/31/2011
Approved
03/17/2011
Erosion Control Inspection Notes

Spoke with Larry and they have tracked in the proposed parking lot area, behind the building and will landscape next week.  He will install silt fence at the top of the bank behind the building.

Erosion Control Site Inspection
Kim Sue
02/28/2011
Approved
02/18/2011
Erosion Control Inspection Notes

Seed and sow proposed future parking lot area.  Seed and sow septic tank, drain field area and driveway behind the new building is to be seeded as a fire lane.  Replace broken conc. at storm drainage outlet with rip rap.

E9 - rpermitdetail
Page 2 of 2